We're back!

After a two and a half week wait, Southwest Gas finally got the gas line disconnected Monday, so we're now finally able to move forward.

The rebar was finished on Tuesday and we passed the inspection for it Wednesday.

Today the concrete contractor will start preparing to shoot the basement walls (they will be created with gunite, similar to how a pool is built). The preparation will take two days, so the gunite should be going in early next week, followed closely by the basement floor, which will be poured.

I'll get some pictures of the prep work for the gunite later today.

Oh, and here's a link to recipe that I highly recommend.
(editorial note: I had to double the recipe)